How to move the lithium battery rack UPS power supply?
by:Vglory
2021-03-22
Relocation steps and measures 1. Relocation planning should be formulated according to the pre-relocation plan, and it is important to know the current system equipment status and system operation status in detail. Develop detailed relocation methods and emergency methods based on what you know. 2. Develop implementation methods After the relocation plan is formulated, it is necessary to formulate specific implementation methods. If the number of lithium battery rack UPS power supplies to be replaced is relatively large, and the on-site construction and installation work has a certain degree of difficulty, it is necessary to budget enough for the construction time to be performed. 3. Relocation Steps: Removal 1. The rack UPS to be relocated shall be self-checked, and the connection line from the original rack UPS to the new rack UPS shall be laid. 2. Turn off the rack-mounted UPS power supply, measure the voltage with a multimeter, and confirm that the input and output MCB are disconnected. 3. Start to remove the input and output cables and battery connections. Disclaimer: Some pictures and content of articles published on this site are from the Internet. If there is any infringement, please contact to delete. Previous: What is the basic status of the recycling of used power batteries?
Custom message
Related Products