What are the requirements before UPS battery installation?
by:Vglory 2021-03-21
Requirements before UPS battery installation 1. Before battery installation, check whether the battery is damaged or leaking, and clean the surface of the battery with a dry cloth. If the battery shell is found to be cracked or leaked, the battery should be replaced immediately to avoid acid corrosion. 2. UPS batteries should be installed upright and not upside down. The distance between adjacent batteries should be greater than 8-10 mm. At the same time, it should be vibration-proof and pressure-proof, and the installation should be firm. . 3. In order to ensure safe use, the battery box in which the Saite battery is installed must have a vent hole of not less than 8 mm, and it must not be blocked to prevent the gas from the battery from gathering in the battery box. 4. The UPS batteries are connected in series, the positive and negative polarity should be correct, and the connection points should be in good contact and no sparks should appear. 5. The battery is charged to the factory, usually the user can install it directly, if it is left for a long time, it should be recharged before use: After the UPS host is installed, connect to 220 volts AC power, the UPS uninterruptible power supply will automatically provide the back-end Scitech battery pack When charging, the first charging time should not be less than 10 hours. Disclaimer: Some pictures and content of articles published on this site are from the Internet. If there is any infringement, please contact to delete.
We are here to help you! If you close the chatbox, you will automatically receive a response from us via email. Please be sure to leave your contact details so that we can better assist