What are the precautions for installing solar batteries?
by:Vglory 2021-04-17
1) The installer (or engineering team) receives the installation task instruction, prepares relevant materials (such as battery installation of various manufacturers, record sheets, etc.) and a full set of installation tools (including multimeters, etc.), and confirms the start date of the project and the progress of the project, etc. 2) The installer (or engineering team) should bring a small amount of system spare parts (such as screws, etc.) to the installation site, obtain a detailed installation project schedule, and discuss project details (such as installation methods, load-bearing conditions, etc.); 3) Before starting the installation Before the project, the installer (or engineering team) should be organized to conduct training, analyze the precautions during the installation process, the battery usage method and maintenance precautions, and pay attention to safety during the installation process; 4) the installer (or engineering team) conducts the battery The unpacking inspection and the inventory of the accessories, the packing list should be signed and taken back by the supervisor. The battery installation system diagram, installation and operation manual and other documents in the accessories box should be collected. After the installation project is completed, the technical staff of the communication company will be responsible for keeping 5) According to the construction drawings, check whether the battery is placed in the machine room reasonably, whether maintenance space is reserved, whether it is kept at a distance of more than 0.5 meters from the heat source and the place where sparks may occur (such as fuse box, etc.). Place it under the air conditioner. If it does not meet the requirements, you should first ask the engineering department of the communication company whether to modify it, and there must be a memorandum if the modification has been made; 6) Unpack the battery system diagram and install it in strict accordance with the battery system diagram. The installation of any missing system components (including the pasting of battery cell numbers) is not allowed. All system components (spare parts) should be exactly the same as the model specifications specified in the installation diagram; 7) Installation. Since the battery is already charged, care must be taken to prevent short circuits. All installation tools must be wrapped with insulating tape; 8) Before installing the connecting strip, wipe off the dust on the battery pole, shell and steel frame with a clean linen cloth, especially to ensure the pole Wipe up the dust on the column. The unit number must be attached firmly; 9) After installation, check whether all screws are tightened one by one. It is necessary to designate a special person to check and be responsible to ensure that all screws are in a tightened state; 10) After the installation and inspection, measure and record the open circuit voltage of all battery cells and the total voltage of the battery pack, and fill in the installation statistics table (or other similar installations). Table); Statement: Some pictures and content of the articles published on this site are from the Internet. If there is any infringement, please contact to delete the previous article: How to use and maintain the battery correctly?
We are here to help you! If you close the chatbox, you will automatically receive a response from us via email. Please be sure to leave your contact details so that we can better assist